title: Successful project case studies
description: Detailed project information for successfully executed wastewater, water, and stormwater projects.
---

# Experience

Case Study, Press Releases, Clean Water, Condition Assessment

[Making Water Mains Sing: Bloomington Invests in Innovative Asset Management with RJN](https://www.rjn.com/blog/bloomington-ava-award)

  

<https://www.rjn.com/blog/bloomington-ava-award>

Case Study, Clean Water, GIS, Condition Assessment

[2025 Clifton Park AVA Assessment - Baltimore City](https://www.rjn.com/blog/ava_baltcity_casestudy)

  

<https://www.rjn.com/blog/ava_baltcity_casestudy>

Case Study, Wastewater, Design, Construction Management, Capacity Analysis

[Wet-Weather Storage Mitigates Recurring Flooding Issues](https://www.rjn.com/experience/wet-weather-storage-case-study)

2 MG wet-weather storage 

<https://www.rjn.com/experience/wet-weather-storage-case-study>

Flow Monitoring, Planning, Condition Assessment, Capacity Analysis

[Sewer Evaluation and Capacity Assurance Planning Minimizes SSOs](https://www.rjn.com/experience/secap-plan-case-study)

<3 SSO per 100 miles achieved 

<https://www.rjn.com/experience/secap-plan-case-study>

Wastewater, Design-Build, Capacity Analysis

[Alternatives Analysis and a 12-Month Design-Build Reduce Overflows](https://www.rjn.com/experience/wet-weather-improvement-case-study)

2016 APWA project of the year 

<https://www.rjn.com/experience/wet-weather-improvement-case-study>

Wastewater, Planning, Design, Capacity Analysis

[Interceptor Master Planning Produces a Phased Improvement Plan](https://www.rjn.com/experience/interceptor-capacity-improvements-case-study)

90% pipe with RUL <2 years 

<https://www.rjn.com/experience/interceptor-capacity-improvements-case-study>

Wastewater, Clean Water, Stormwater, Design, Condition Assessment

[Utility Study Lays the Foundation for Downtown Renewal](https://www.rjn.com/experience/downtown-utility-renewal-case-study)

700+ assets mapped 

<https://www.rjn.com/experience/downtown-utility-renewal-case-study>

Clean Water, Condition Assessment

[Valve Study Informs Asset Planning ](https://www.rjn.com/experience/water-system-maintenance-planning-case-study)

1,072 valves inspected and assessed 

<https://www.rjn.com/experience/water-system-maintenance-planning-case-study>

Wastewater, Clean Water, Design, Capacity Analysis

[Design of Aerial Crossing Near Power Plant Offers Unique Challenges](https://www.rjn.com/experience/aerial-lake-pipe-crossing-design-case-study)

4,020 LF water main designed 

<https://www.rjn.com/experience/aerial-lake-pipe-crossing-design-case-study>

Wastewater, Design

[Creative Solutions for a Large Diameter Lining Project](https://www.rjn.com/experience/large-diameter-pipe-lining-case-study)

2,900 LF bypass pumping 

<https://www.rjn.com/experience/large-diameter-pipe-lining-case-study>

Stormwater, GIS, Asset Management

[Building a Comprehensive Stormwater Asset Inventory](https://www.rjn.com/experience/storm-water-system-engineering-case-study)

74.2  miles of unrecorded assets discovered 

<https://www.rjn.com/experience/storm-water-system-engineering-case-study>

## What is your challenge?

[Tell us about your project](https://www.rjn.com/contact-us)