Company
Services
Publications
Case Studies
Contact
CASS WORKS

Information Technology

Sanitary Sewers

Site Development

SSO Reduction

Stormwater

Structural Engineering

Transportation

Wastewater Treatment

Water Distribution

 

Preliminary Phase
Phase I

The preliminary engineering study includes the following elements:

  • Feasibility studies
  • Traffic and capacity studies
  • Route studies and schematic design
  • Right-of-way preparation
  • Aerial mapping/preliminary surveying
  • Environmental studies
  • Hydrology/hydraulic studies
  • Preliminary bridge design
  • Public Meetings

Plans, Specifications, & Estimates (PS&E)
Phase II

Contract documents are developed to meet the owner’s needs for the project. PS&E documents include the following elements:

  • Project layout sheets
  • Typical sections
  • General notes and specifications
  • Estimate and quantity sheets
  • SW3P sheets
  • Traffic control plans
  • Horizontal/vertical control sheets
  • Signs, pavement striping, and markers
  • Drainage area map
  • Hydraulic data sheets
  • Drainage/culvert plan and profile sheets
  • Bridge layout and plan/profile sheets
  • Roadway illumination
  • Traffic signalization
  • Miscellaneous details
  • Roadway cross-sections
  • Specifications and contract documents

Construction Phase
Phase III

Engineers are on site to meet the needs of our clients. RJN has a proven record of completing projects on schedule and within budget. Our resident engineers ensure quality results. Services include:

  • Bidding assistance
  • Construction layout and staking
  • Full-time, on-site monitoring
  • Administration and documentation
  • Schedule coordinator
  • Computerized tracking of work

Streetscape

RJN Group, Inc. has engineered streetscape and downtown redevelopment projects for numerous transportation projects. Technical features include:

  • Landscaping
  • Brick pavers







View Current Projects >>

©2007 RJN Group, Inc.