Dallas Water Utilities Infrastructure Improvements
In an area bounded by IH 635 to the north and east, IH 20 to the south and Loop 12/Spur 408 to the west, the RJN Group, Inc. is in an agreement to provide design services for approximately 72,000 linear feet of water and associated wastewater main improvements. The design services will be completed in two major phases. The initial phase includes providing total turn key design services where RJN will perform the preliminary design, surveying, utility coordination, and plans and specifications for approximately 50,000 linear feet of water and associated wastewater main. The second major phase includes partial turn key design services where RJN will perform the preliminary design, surveying, utility coordination, and provide design base sheets for DWU to perform their own design for approximately 22,000 linear feet of water and associated wastewater main.
Design services for the initial phase have been completed. This phase consists of 2 separate construction packages. The first package is currently under construction and is expected to be completed by June 2007. The second construction package will be advertised in the Spring of 2007. The City staff is responsible for the final design of the second phase of the project. Total construction cost is estimated at $10 million.
For a complete list of projects, click here. Dallas Water Utilities click here.
Contact Information
You may contact RJN Group, Inc., with any comments or questions that may arise during this study.
| City of Dallas |
RJN Group, Inc. |
Joe Felipe , P.E.
Project Manager
Dallas Water Utilities
2121 Main Street, Suite 300
Dallas, Texas 75201
214.948.4238
Fax: 214.948.4551
joselito.felipe@dallascityhall.com |
12160 Abrams Road, Suite 400
Dallas, Texas 75243
972.437.4300
Fax: 973.437.2707
Peter Lai , P.E.
Project Manager
plai@rjn.com
|